red seal exam trades
Steamfitter & Pipefitter
$70.00
Each Red Seal Exam Trade Package is available for:
All files will be emailed to you same day.
Our Steamfitter & Pipefitter 307A Red Seal Exam package contains 751 multiple choice questions and answers to give you the most complete exam package to help you prepare for your Inter-Provincial Red Seal Exam.
Steam & Pipe Fitters build, install and maintain piping systems that carry almost every fluid that can be carried through a pipe but generally they include oil and gas products, water, steam, chemicals and even wood chips. They are the only trade that specializes in design, planning, and installation of high and low pressure steam systems and installation methods for steam. This includes working on heating and cooking systems for processing and manufacturing up to installation of piping for nuclear reactors, crude oil cracking processes, offshore platforms, and many other types of steam powered processes.
​
You will receive all our modules emailed directly into your inbox same day so you can begin studying immediately. This allows you to open the files on any Computer,
I-Phone or Android device directly from your email inbox so you can study at your own pace anywhere at anytime without the worry and pressure of expiring limited online sessions. All modules have been developed in PDF and are printable if required.
​
Safe working practices and accident prevention are the primary importance to the health and safety of all person(s) at any or all work place environments. All person(s) including employee, employer and government, share this responsibility in order to keep everyone free of any dangers or accidents that may cause an individual(s) serious bodily harm or death. Practicing health and safety is a tremendous contribution to a safe and accident free work place environment.
Sample Questions
1. What is the principal function of the expansion tank in a hot water system?
a. It provides the necessary space for the air required in the system.
b. It allows the volume of the water in the system to change to maintain working pressure.
c. It acts as a safety chamber in case of over firing of the boiler.
d. It collects the air in the system, thus preventing air lock of the system while in operation.
Ans. B
2. What must be determined prior to selecting a hydronic circulator?
a. System resistance and pipe size.
b. System resistance and flow rate.
c. Height of building and flow rate.
d. Height of building and pipe size.
Ans. B
3. How should the vent and drain valves be positioned when filling a pipeline for hydrostatic testing?
a. Vents closed and drains closed.
b. Vents closed and drains open.
c. Vents open and drains open.
d. Vents open and drains closed.
Ans. D
4. What adjustment can be performed to a boiler feed water pump that has a leaking packing?
a. Apply a water tight silicone to the packing.
b. Loosen the packing and install more packing material.
c. Carefully tighten the packing while the pump is running.
d. Stop the pump and tightening the packing gland with a pipe wrench.
Ans. C
5. A valve has failed on the supply header of an existing steam tracing system. The tracing is tied into an existing valve on the header that was intended for future use. After following proper start-up procedures, it is discovered that the tracing fills with condensate. What is the first thing to be done to solve the problem?
a. Check with the engineer to see if tying into the new valve overloaded the system.
b. Check for blockages in the thermodynamic trap on the return header
c. Check to see if the existing valve needs to be rodded for calcification.
d. Check to see if tracing is kinked.
Ans. C
Get the most complete exam information package today, easily & affordably from Red Seal Exam Trades Group and pass your Inter-Provincial Red Seal Exam with confidence!